Each day 1,800 tons of pine and timber slash, sustainably harvested within a 60-mile radius and ground into wood chips, is fed into the roaring furnaces of the McNeil Generating Station, pumping out nearly half of the city’s electricity needs.
Much of the rest of what Burlington’s 42,000 citizens need to keep the lights on comes from a combination of hydroelectric power drawn from a plant it built a half mile up the Winooski River, four wind turbines on nearby Georgia Mountain and a massive array of solar panels at the airport.
Together these sources helped secure Burlington the distinction of being the country’s first city that draws 100 percent of its power from renewable sources.